Hotel Remodel Project in downtown San Diego.
Typical Commercial work. Running MC, setting boxes, setting can lights identifying existing circuits. Replacing switches, replacing lightbulbs. Lighting controls. Gear/panels install. conduit install.
6 months of work for the right people. This is a 6 day a week project, with the schedules for these projects typically include weekend work. we prefer full-time hourly employees with flexible weekends / weekday work. 40 hour weeks are the goal Text only. Project starting on 1/20/25
No weed, no drugs, no alcohol on site. Before or during work will be immediate dismissal.
Bring your own tools: pouch, power drills, hand tools. we have the rest!
Contact Romulus @ (323) 371-3202